We’ve been given the OK by JH admin to start working on this during the last week of school. Minimal instruction will be going on.

Things to do in Mid May:

  •  Identify long VGA cables (and others) we don’t use anymore in classrooms. Remove and /or coil up and tie off to building supports.
  •  Coil up old network cables in classrooms that aren’t in use, but one day we might
  •  Label camera cables and cameras with matching identifiers. – SHARPIE
  •  Verify audio works in room prior to tear down.
  •  Verify LRC is for Tech stuff at JH.
  • Glen said could use LRC but to be mindful of the lights --- they are getting replaced (new bulbs) at LRC at JH. Also offered up we could likely use band room for storage at JH.

  •  Verify LRC at MIS is open for JH cleaning, etc. (Pekol said she’s fine with us using LRC).
  •  Need more 8 foot ladders
  • Talked to Glen – he was going to look for a ladder or two for us to use at JH. JH has 2 right now, so that might be enough for a while.

Things to do:

  •  Figure out a process for labeling/removing/relocating technology equipment from rooms.
  •  8th grade chromebooks need to be moved to another building.
    •  Pile on pallets at LRC – move MIS
  •  Melendez will need to be moved to another building.
  •  Tear down cameras in hallways, tie the cables up in the ceiling
  •  Identify long VGA cables (and others) we don’t use anymore in classrooms. Remove and /or coil up and tie off to building supports. Push copiers into LRC for imagetec pickup
  •  Make sure all classroom phone keystones are properly labeled

Tearing down rooms:

  •  Phones need to be labeled and removed from rooms
  •  APs need to be labeled and removed from rooms
  •  Projectors/ w (bottom half) mounts need to be labeled and removed from rooms
  •  Speakers need to be disconnected
  • . We expect the plate, pole, and top of half of mount will stay (Per Jason, he is telling teachers no projectors on Thursday 5/25 so we can pull them then)
  •  Remove any cabling that teachers use (network, audio, VGA, etc)
  •  Extra devices (chromebooks, chargers, document cameras) need to be labeled and removed from rooms.

Room Teardown Quick list

Lref gdrive file
urlhttps://docs.google.com/spreadsheets/d/106GSB2KCc8k3VOzlvxIyLH82NxXrUYrvGaIrJEnhCiw/edit?usp=sharing

Map of working areas:

View file
nameJH Teardown Map.pdf

...