Project Owner and Title

Due

Description / Documentation:

  •  Afrim Bakii JH & MES Internet Speed Upgrade

Upgrade both internet connections from 1gbps to 2gbps

  •  Afrim Bakii Mist AP Deployment District Wide

All new Mist access points installed and tested

Upgrade switches from MES purchase to eliminate all EX 2200 models

All switches reconfigured to be managed by Mist interface

  •  Afrim Bakii AUX <> MES Link on AT&T Installed

ATT managed AUX <> MES link installed and working

Radius configured, tested and implemented district wide

Full-blown Disaster Recovery Test / Simulation. Aaron Souza Matthew Shackley

All closets inspected, cleaned up and critical cables labeled.

  • MIS MDF/Cafe IDF

  • JH MDF/LRC IDF

  • AUX IDF

  • MPC MDF/ IDF Rm 113/ Upstairs IDF

Technology Staff Vlan configured and rolled out for enhanced security

...