Summer Building 2024 Check List
Task | Due | JES | WT | MES | MPC | MIS | JH | AUX |
---|---|---|---|---|---|---|---|---|
Confirm Lockdown Buttons on Phones | 7/26 | |||||||
Set up Summer IVR on main phone lines | ||||||||
Room Teardown
| 5/31 | |||||||
Turn off AV amps / cabinets | 5/31 | |||||||
Email Groups Updated
| ||||||||
Clean Projectors | 8/1 | |||||||
Keystone jacks inspected & ordered | 5/31 | |||||||
Resigned/Retired Teacher Laptops Imaged and Updated | 7/26 | |||||||
Rooms Set Up and Tested | 7/26 | |||||||
Inventory of Spare Devices Done | 7/26 | |||||||
Mimios Distributed as appropriate | 7/26 | |||||||
Plan on new student growth.
| 8/9 | |||||||
K-2 Clever Badges | 8/13 | |||||||
Inspection of turned-in HP laptops | 6/7 | |||||||
Counting / Organizing Old Windows laptops to upgrade to turned in HPs. | 6/7 | |||||||
K4 Ipad Deployment | 8/13 | |||||||
New Chromebook Deployment | 8/13 | |||||||
Camera Installs | 7/26 | |||||||
AP Deployment | 6/14 | |||||||
Set IVR back to normal | ||||||||
Inspect all cameras for positioning and focus | 7/26 | |||||||
Algo Light Install | 7/26 | |||||||
Clean / Image Computer for Staff Sale | 6/21 |
Building Technician Advanced / Progress Projects:
https://trello.com/b/ODrTEMGt/tech-summer-projectsDepartment Summer Projects
Project Owner and Title | Due | Description / Documentation: |
---|---|---|
|
| Clean / Image laptops for staff sale. |
|
| Board Room AV Upgrade Project. |
|
| Glen approved – hiring some electrician to install an outlet. He’s thinking about conduit. Project Summary: |
|
|
|
|
| Project: Error rendering macro 'lref-gdrive-file' : Page loading failed |
|
| Bus Camera Fleet install by Provision. Provision coming out July 22-August 1. |
|
| Install new copper cables at MIS, fiber at WT and fiber at JH by Eric from Total Solutions. Begins 5/28 estimated completion 5/31 |
|
| ITR to install new audio equipment at wood gym at JH. Begins 6/3 |
Network Tasks
Project Owner and Title | Due | Description / Documentation: |
---|---|---|
|
| Upgrade both internet connections from 1gbps to 2gbps |
|
| All new Mist access points installed and tested |
|
| Upgrade switches from MES purchase to eliminate all EX 2200 models |
|
| All switches reconfigured to be managed by Mist interface |
|
| ATT managed AUX <> MES link installed and working |
|
| Radius configured, tested and implemented district wide |
|
| Full-blown Disaster Recovery Test / Simulation. Aaron Souza Matthew Shackley |
|
| All closets inspected, cleaned up and critical cables labeled.
|
|
| Technology Staff Vlan configured and rolled out for enhanced security |
Data Projects
Project Owner and Title | Due | Description / Documentation: |
---|---|---|
|
| |
|
| All new students are delivered to PS. https://trello.com/c/Bume97ro |
|
| All returning students delivered/updated in PS. https://trello.com/c/iljeIXAT |
|
| Ensure a smooth summer school rollout. /wiki/spaces/TK/pages/1340932101
|
|
|
|
|
| Update data syncs to Versatrans including new fields. https://trello.com/c/lKwkRZMv |
|
| Promote all student accounts to 24-25 grade year https://trello.com/c/ZuPCbLt9 |
|
| |
|
| |
|
| Bulk PDF yearly health form information for nurses for new and returning students. |
|
| David Plaskett Aaron Souza Review at high-level new data dashboard systems. eduClimber, Scholastycs (email from Aaron), DCR insights (PSUG) |
|
| Finalize the snap program roll over with Amy. |
District Technician
Project Owner and Title | Due | Description / Documentation: |
---|---|---|
|
| Update images for all of our teacher laptop models |
|
| Update Servers to new Windows versions for security |
|
| Set up all A/V equipment for board room in MPC gym. |
|
| Work with Maintenance and Joseph Prusinski to remove 1-2 shelves in MIS MDF . |