Summer 2022-2023
Summer Building 2022 Check List
Task | Due? | JES | WT | MES | MPC | MIS | JH | AUX |
---|---|---|---|---|---|---|---|---|
Set up Summer IVR on main phone lines | 6/10 | |||||||
Room Teardown | 6/3 | |||||||
Turn off AV amps / cabinets |
|
|
|
| ||||
Email Groups Updated
| 6/24 | |||||||
Clean Projectors | 8/1 | |||||||
Inventory of Chromebooks, Ipads, etc | 7/1 | |||||||
Keystone jacks inspected & ordered | 7/1 | |||||||
Inspect all turned in ipads / kickstands | 7/1 |
|
| |||||
Inspect all turned in chromebooks | 7/1 |
|
| |||||
Extensions Updated
| 8/1 | |||||||
Resigned/Retired Teacher Laptops Imaged and Updated | 7/1 | |||||||
Teachers Laptops Distrubted / Ready | 7/15? | |||||||
Rooms Set Up and Tested | 8/1 | |||||||
Phones Factory Reset
| 8/1 |
|
|
|
| |||
Mimios Distributed as appropriate | 8/1 |
|
|
| ||||
Plan on new student growth.
| 8/17 |
| ||||||
K-2 Clever Badges | 8/16? |
|
|
| ||||
Secretary Tower Installation | 8/1 | |||||||
4th Grade CB Inspection /Collection (for current 3rd grade) | 7/1 |
|
|
|
Major Summer Projects:
Title & Owner | Description / Sub Tasks |
https://min201.atlassian.net/wiki/spaces/TK/pages/1325596673 | |
Checklist: Unpack, inventory, enroll CB Assign students to machine, label and case. QR Code print for 2nd grade. | |
Checklist: Clean existing ipads, wipe data from them, configure in new role. QR Code print @Andrew Huffman K and 1st grade Ipad Deploy Aug 12, 2022 @Bruce Thornton K and 1st grade Ipad Deploy Aug 12, 2022 @Sam Mayper K and 1st grade Ipad Deploy Aug 12, 2022 @David Plaskett K and 1st grade Ipad Deploy Aug 12, 2022 | |
“Big Tech”Summer Projects
Project Title | Due | Done? | Leader | Description |
E-Document Scanning Rollout | 8/1 | Aaron | Project Page: E-Document Management | |
Install new phones (Yealink) in classrooms | 8/1 |
|
| |
June DR Test |
| Afrim/Matt |
| |
Deploy staff ipads |
|
|
| |
Apple School Manager Configuration | 8/1 | Sam / Afrim | ||
Update PS Teacher documentation (moving away from UC / updated how to docs) | 8/10 | Pam / Matt | https://min201.atlassian.net/wiki/spaces/TK/pages/1304068109 |
Networking Summer Tasks
Project Title | Due | Done? | Description | Why |
Copier VLAN segmentation |
|
|
| |
VLAN Consolidation |
|
|
| |
New Fiber internet - ICN |
|
|
| |
WAN connections ICN (MIS <> MES) and (JES <> MES) |
|
|
| |
JH LRC IDF Redeploy |
| Canceled - Equipment delayed until April 2023 |
| |
MasterDC decomissioning |
|
|
| |
Cisco Duo MFA Deployment Network Infrastructure |
|
|
|
Systems Summer Tasks
Project Title | Due | Done? | Lead? | Description | Why/Reason? |
Refreshing standards | 8/1/2022 |
| Pam/Matt | Ticket #24375, #24430, #23525 | |
PS EOY Rollover | 7/6/2022 | Pam |
| ||
New Student Delievery | 6/15/2022 |
| Start working on delievery of new students for the 22-23 school year from registration | To get new students into PS. | |
Returning Student Delievery | 8/18/2022 |
|
|
|
|
Removing trimesters from Kindergarten (and homeroom) | 8/1/2022 |
| Pam |
| |
Updating Clever rules for removing trimesters and removing non-renewed applications (adding new ones too!) | 8/1/2022 |
|
| Great Minds - add LA 6, adv LA 6 and adv LA 5 in (drop the sharing rules for studysync - HMH) Typing agent - include 1st grade | |
NWEA → Clever Project? |
| Aaron? | Ticket #24604 |
| |
|
|
|
|
|
|
Maintenance and Tech Projects:
Project | Lead | Date | Description |
---|---|---|---|
MES HVAC | Maint | All Summer | Notes: Rich walked us down 5/27/22 and showed how contactors will cover our equipment with fire proof blankets. We are only going to move access points away to be extra safe. Some projectors already taken down, ahead of this change. 5/31/22 - Projectors were taken down as advised by the construction crew here. Speakers were left in place. |
MPC Staab Office | Maint | All Summer | |
DO GilBane room | Maint | All Summer | |
JH Front Office Tear Out | Maint | All Summer | |
Elevator POTS lines | Tech | All Summer | |
Replace AUX and MES Gym Projector | Tech | Any time summer | |
JH LRC AV Install | Tech | July | |
|
|
|
|
|
|
|
|
Hired out Projects
Project | Vendor | Dates | Description |
---|---|---|---|
JH Network Cabling | Total Infrastructure solutions | 5/31 - 6/3 | Install one network cable drop per classroom or learning area. ERATE
|
JH Tile gym Audio system | ITR | July | Install all necessary audio equipment and rack for “house sound” in tile gym. |
Wireless PTP to Pole Barn | Entre II | May/June | Install wireless PTP equipment to get a network switch to pole barn for future camera installations and possible wireless connectivity |
Misc. Other Tasks
Project Title | Due | Done? | Lead? | Description | Why/Reason? |
Collection of 4th grade CBs |
|
| Clean / find good ones to replace current 3rd grade as needed & loaners |
| |
Improve E911 | 8/10 | Aaron | Upgrade our E911 feature set | Our system just passes regulations or is lacking in some areas. | |
Update all AD job title/descriptions | 7/1 |
| Pull from onboarding and match. | Job title synchronization across systems. | |
Email group retweak / cleanup / redesign / consolidation? |
|
|
|
| |
Fix WSUS Server |
| Matt | Do a fresh install of WSUS server | Looking to make this work better. Currently cannot delete unused updates because there are so many. | |
MPC iPad Cart |
|
| Either replace, or recycle the devices | Current iPads need to be replaced, decide if they still want the cart or not. | |
Create Updated Image for Dell and HP Teacher Laptops |
| Matt |
|
|
Summer OverView
Completed Tasks: