Summer 2022-2023

Summer 2022-2023

Summer Building 2022 Check List

Task

Due?

JES

WT

MES

MPC

MIS

JH

AUX

Task

Due?

JES

WT

MES

MPC

MIS

JH

AUX

Set up Summer IVR on main phone lines

6/10

Room Teardown

6/3

Turn off AV amps / cabinets

 

 

 

 

Email Groups Updated

  • All transfers / job swaps

6/24

Clean Projectors

8/1

Inventory of Chromebooks, Ipads, etc

7/1

Keystone jacks inspected & ordered

7/1

Inspect all turned in ipads / kickstands

7/1

 

 

Inspect all turned in chromebooks

7/1

 

 

Extensions Updated

8/1

Resigned/Retired Teacher Laptops Imaged and Updated

7/1

Teachers Laptops Distrubted / Ready

7/15?

Rooms Set Up and Tested

8/1

Phones Factory Reset

  • Yealinks

8/1

 

 

 

 

Mimios Distributed as appropriate

8/1

 

 

 

Plan on new student growth.

  • Have at least 5 devices per grade ready

8/17

 

K-2 Clever Badges

8/16?

 

 

 

Secretary Tower Installation

8/1

4th Grade CB Inspection /Collection (for current 3rd grade)

7/1

 

 

 

 

 

Major Summer Projects:

Title & Owner

Description / Sub Tasks

https://min201.atlassian.net/wiki/spaces/TK/pages/1325596673

Checklist:

Unpack, inventory, enroll CB

Assign students to machine, label and case. QR Code print for 2nd grade.

Checklist:

Clean existing ipads, wipe data from them, configure in new role. QR Code print

@Andrew Huffman K and 1st grade Ipad Deploy Aug 12, 2022

@Bruce Thornton K and 1st grade Ipad Deploy Aug 12, 2022

@Sam Mayper K and 1st grade Ipad Deploy Aug 12, 2022

@David Plaskett K and 1st grade Ipad Deploy Aug 12, 2022

“Big Tech”Summer Projects

Networking Summer Tasks

Project Title

Due

Done?

Description

Why

Copier VLAN segmentation

 

 

 

VLAN Consolidation

 

 

 

New Fiber internet - ICN

 

 

 

WAN connections ICN (MIS <> MES) and (JES <> MES)

 

 

 

JH LRC IDF Redeploy

 

Canceled - Equipment delayed until April 2023

 

MasterDC decomissioning

 

 

 

Cisco Duo MFA Deployment Network Infrastructure

 

 

 

 

Systems Summer Tasks

Project Title

Due

Done?

Lead?

Description

Why/Reason?

Refreshing standards

8/1/2022

 

Pam/Matt

Ticket #24375, #24430, #23525

PS EOY Rollover

7/6/2022

Pam

 

New Student Delievery

6/15/2022

 

Start working on delievery of new students for the 22-23 school year from registration

To get new students into PS.

Returning Student Delievery

8/18/2022

 

 

 

 

Removing trimesters from Kindergarten (and homeroom)

8/1/2022

 

Pam

 

Updating Clever rules for removing trimesters and removing non-renewed applications (adding new ones too!)

8/1/2022

 

 

Great Minds - add LA 6, adv LA 6 and adv LA 5 in (drop the sharing rules for studysync - HMH)

Typing agent - include 1st grade

NWEA → Clever Project?

 

Aaron?

Ticket #24604

 

 

 

 

 

 

 

Maintenance and Tech Projects:

Project

Lead

Date

Description

Project

Lead

Date

Description

MES HVAC

Maint

All Summer

Notes: Rich walked us down 5/27/22 and showed how contactors will cover our equipment with fire proof blankets. We are only going to move access points away to be extra safe. Some projectors already taken down, ahead of this change.

5/31/22 - Projectors were taken down as advised by the construction crew here. Speakers were left in place.

MPC Staab Office

Maint

All Summer

DO GilBane room

Maint

All Summer

JH Front Office Tear Out

Maint

All Summer

Elevator POTS lines

Tech

All Summer

Replace AUX and MES Gym Projector

Tech

Any time summer

JH LRC AV Install

Tech

July

 

 

 

 

 

 

 

 

 

Hired out Projects

Project

Vendor

Dates

Description

Project

Vendor

Dates

Description

JH Network Cabling

Total Infrastructure solutions

5/31 - 6/3

Install one network cable drop per classroom or learning area. ERATE

  • Talked to Eric, they will also run 5 cables or the JH front desk installation. Maintenance to work on a pipe / conduit for it.

  • COMPLETE

JH Tile gym Audio system

ITR

July

Install all necessary audio equipment and rack for “house sound” in tile gym.

Wireless PTP to Pole Barn

Entre II

May/June

Install wireless PTP equipment to get a network switch to pole barn for future camera installations and possible wireless connectivity

Misc. Other Tasks

Project Title

Due

Done?

Lead?

Description

Why/Reason?

Collection of 4th grade CBs

 

 

Clean / find good ones to replace current 3rd grade as needed & loaners

 

Improve E911

8/10

Aaron

Upgrade our E911 feature set

Our system just passes regulations or is lacking in some areas.

Update all AD job title/descriptions

7/1

 

Pull from onboarding and match.

Job title synchronization across systems.

Email group retweak / cleanup / redesign / consolidation?

 

 

 

 

Fix WSUS Server

 

Matt

Do a fresh install of WSUS server

Looking to make this work better. Currently cannot delete unused updates because there are so many.

MPC iPad Cart

 

 

Either replace, or recycle the devices

Current iPads need to be replaced, decide if they still want the cart or not.

Create Updated Image for Dell and HP Teacher Laptops

 

Matt

 

 

 

 

 

 

Summer OverView

23-May202230-May06-Jun13-Jun20-Jun27-Jun04-Jul11-Jul18-Jul25-Jul01-Aug08-Aug15-Aug22-Aug29-Aug
IT Support
Ed Tech
Communications
Automation

Feature 1

Feature 2

Aux new Cabling

8th Grade CB

4th Grade CB

Collect K,1,4,8 Devices

Ipad Reconfiguration

5th Grade CBs

2nd Grade CBs

Install new Admin Phones

New Firewall Install

Organize / Evaluate CBs for New Sale

Identify Broken turned in Units

Ipad kickstands

Support Extended Summer School & Course Recovery

Support Camp Minooka

Support Camp Minooka

Enrichment Camp

Feature 3

SOPPA iPad Apps

SOPPA CB Sites

Identify all broken keystones

Replace broken Phones

New Teacher How To

Install Campus Projectors

Install new phones

New Staff Laptops

Update Parent How To

Tech Training by Aaron

All Techs PD Course

IDF / MDF Clean up

PS EOY Roll

UC EOL

 

 